Bathroom Remodeling in Cedar Park, TX: Costs & Process 2026
Most Cedar Park bathroom remodels run 3 to 5 weeks of construction once demolition starts, and the price depends on whether you keep the existing plumbing walls or move them. We give you a fixed price in writing before anyone swings a hammer, so the number you sign is the number you pay.
Already planning a bathroom remodel? Get a real price for your house →

What a Bathroom Remodel Costs in Cedar Park
Cedar Park housing stock is mostly 1990s through 2010s builder homes — Buttercup Creek, Cypress Creek, Ranch at Brushy Creek, Twin Creeks. That means garden tubs with fiberglass surrounds, cultured marble vanity tops, and a primary bath that's bigger than it needs to be because half of it is tub deck.
Scope drives the price more than square footage. A guest bath where the toilet, vanity and tub stay where they are is a different job than a primary bath converted to a curbless wet room with a linear drain, which means opening the slab or working the drain line from below. We price both the same way: a fixed number in writing after design is done.
- Guest or hall bath, same footprint — new tile, vanity, toilet, tub/shower, lighting and exhaust
- Primary bath refresh in place — tile shower, new vanity cabinetry, quartz top, frameless glass
- Primary bath reconfigured — tub deck removed, shower enlarged, plumbing relocated, curbless entry
- Full replumb — older homes or failing supply lines swapped while walls are open
Where the Money Actually Goes
Tile labor and shower waterproofing are the two line items homeowners underestimate. A properly built curbless shower needs the subfloor or slab recessed, a bonded waterproofing membrane, a linear drain set dead level, and a sloped pan — that's days of work before a single tile goes on. Skipping it is how you get a leak into the bedroom carpet three years later.
Moving plumbing is the other cost jump. In a slab-on-grade Cedar Park home, relocating a toilet flange or shower drain means saw-cutting concrete, trenching, re-plumbing, and pouring back. If your layout works, keeping fixtures in place saves real money. If it doesn't work, move it once and be done — we'd rather you spend it on the right layout than on tile you'll resent.
- Shower waterproofing and pan build — non-negotiable, done by our own carpenters
- Tile: floor, shower walls, niche, curbless threshold detailing
- Vanity cabinetry and countertop — stock, semi-custom or built in our shop
- Plumbing fixtures, valves, and any drain relocation
- Electrical: GFCI, vanity lighting, exhaust fan ducted to the exterior
- Drywall, paint, trim, glass, and the punch list
Permits and Inspections in Cedar Park
Cedar Park is in Williamson County and has its own building department — if your address is inside city limits, you permit through the City of Cedar Park, not the City of Austin. We handle City of Austin permits on our Austin jobs and we handle Cedar Park's the same way: we pull them, we schedule the inspections, we meet the inspector.
A bathroom remodel needs a permit when you're altering plumbing, electrical or structure — which is nearly every real remodel. Expect rough-in inspections for plumbing and electrical before we close the walls, and a final once fixtures and trim are set. Some Cedar Park neighborhoods also have an HOA with exterior or scheduling rules; if your job touches anything visible, we'll tell you what to submit.
Permitting happens during design, before demolition. That's why the construction calendar we hand you holds — we're not waiting on a plan review with your bathroom already gutted.
How Our Fixed-Price Design-Build Process Works
Design-build means one contract and one accountable party. You aren't hiring a designer, then bidding it out, then discovering the drawings cost $20k more than you planned.
We start with a walkthrough and a conversation about budget. Then we design: layout, tile, cabinetry, fixtures, all selected and specified before pricing. Once selections are locked, we write a fixed-price contract — line by line, no allowances hiding a surprise. Permits go in. Then we demo.
Our carpenters are on our payroll, not a rotating cast of subs. That's why we can put a 5-year workmanship warranty behind the work. Financing is available if you'd rather not pull from savings.
- Walkthrough and budget conversation
- Design and selections — tile, cabinetry, fixtures, lighting
- Fixed price in writing, plus a dated construction calendar
- Permit submitted and approved before demolition
- Build: 3 to 5 weeks for a typical bath
- Final inspection, punch list, 5-year workmanship warranty
How to Vet a Cedar Park Bathroom Contractor
Ask three questions and you'll sort the field fast. First: is this a fixed price or an estimate? An estimate is a guess you pay for later. Second: who is physically doing the work, and are they employees? Third: who pulls the permit? If a contractor asks you to pull it as a homeowner, that's them avoiding inspection accountability.
Then ask how they waterproof a shower and listen for specifics — membrane type, pre-slope, how they handle the curbless threshold. A vague answer on waterproofing is the single best predictor of a call-back in year four.
Timeline: What 3 to 5 Weeks Looks Like
Design and permitting run before that clock starts — budget several weeks depending on selections and how quickly the city turns the review. Once we demo, a same-footprint guest bath lands near three weeks. A primary bath with relocated plumbing, a curbless wet room and custom cabinetry runs toward five.
If you're remodeling your only full bathroom, tell us at the walkthrough. We sequence differently and keep a usable bath online where the house allows it. If you're also weighing a kitchen, plan on 6 to 10 weeks there, and let us schedule both so you're not living through two separate disruptions.
Cedar Park homeowners also ask
Do I need a permit for a bathroom remodel in Cedar Park?
If you're altering plumbing, electrical or structure — yes, through the City of Cedar Park building department, not Austin, if you're inside city limits. We pull the permit, schedule rough-in and final inspections, and meet the inspector. It's included in our fixed price.
Can you build a curbless shower on a slab foundation?
Yes. On slab-on-grade, it means saw-cutting and recessing the shower area so the drain and pan slope sit below the finished floor, then a bonded waterproofing membrane over a proper pre-slope. It costs more than a standard curbed pan, and it's the right call if you want aging-in-place access. We'll price it clearly so you can decide.
How long will my Cedar Park bathroom be out of service?
Three to five weeks of construction for a typical bath — three on the low end for a same-footprint guest bath, five for a primary with relocated plumbing and custom cabinetry. Design and permitting happen before demolition, so that calendar is the one we build to.
What does the 5-year workmanship warranty cover?
Our labor and installation — tile, waterproofing, cabinetry, trim, and the way fixtures were set. Manufacturer warranties on the fixtures themselves are separate. Our carpenters are in-house employees, which is why we can stand behind the work for five years instead of chasing down a sub who moved on.