Whole-Home Renovation in Westlake, TX: Cost & Process 2026

By the Home Remodel Pro team ·

A down-to-studs whole-home renovation in Westlake runs 4 to 8 months of construction, and we hand you a fixed price in writing before demolition starts. One contract, one schedule, one crew of in-house carpenters. Design and permitting are finished first, so the calendar you get on day one is the calendar we build to.

Whole-home renovation of a 1940s Austin bungalow with a rebuilt front porch — Westlake, TX

What a Whole-Home Renovation Costs in Westlake

Whole-home pricing is built from the rooms inside it, so the honest way to budget is to price the big-ticket spaces first. Most Austin-area kitchens we build land between $45,000 and $120,000. A cosmetic kitchen refresh with new counters, paint and fixtures starts around $45,000. Move walls, relocate plumbing, or specify custom cabinetry and high-end appliances and that kitchen heads toward $120,000 and up.

Bathrooms, flooring, windows, HVAC, electrical and structural work stack on top of that. Westlake homes from the 1980s and 1990s often need panel upgrades, new ductwork and window replacement at the same time, which is exactly why doing it all in one contract costs less than three separate projects. We scope every line item, then lock the number.

Financing is available if you would rather keep cash in place while the work runs.

  • Kitchen: $45,000 cosmetic refresh to $120,000+ for walls moved and custom cabinetry
  • Bathrooms: priced per room, typically 3 to 5 weeks of work each
  • Systems: electrical, plumbing, HVAC and insulation scoped before we quote
  • Structure: beams, headers and foundation work priced with engineering, not guesses
  • One fixed price in writing covering the whole scope, not a per-room estimate

Timeline: 4 to 8 Months of Construction

A whole-home renovation is 4 to 8 months of construction. Where you land depends on square footage, how much structure changes, and whether we are adding on. A cosmetic-heavy renovation with existing walls staying put finishes near the short end. Taking a Westlake hillside house down to studs, reframing an open plan and rebuilding all the wet areas sits at the long end.

Design and permitting happen before demolition. That is not a delay tactic; it is what makes the construction schedule real. Once we break ground, the sequence is set and the trades are already booked.

Most Westlake clients move out for the duration. If you plan to stay in part of the house, tell us during design and we will phase the work, though phasing adds time.

Permits and Inspections in Westlake

Westlake sits in Travis County west of Loop 360, and depending on your exact address your project is reviewed by the City of Rollingwood, the City of West Lake Hills, or Travis County, with the City of Austin involved on some parcels through limited-purpose annexation and ETJ agreements. We confirm the reviewing authority before design, not after.

West Lake Hills has its own building official and its own rules on impervious cover, tree protection, slope and setbacks — they matter a lot on the steep lots off Westlake Drive and Redbud Trail. Many Westlake properties also fall inside the Barton Creek or Lake Austin watersheds, which triggers water quality review. Septic systems under Travis County jurisdiction need their own permit path if you add bedrooms or bathrooms.

We handle the permit applications, the drawings, the engineering letters and every inspection call. You do not chase a plan reviewer or sit in a hearing.

Structural changes, new electrical service, gas line work and window openings are all inspected work. We schedule inspections into the build calendar so nothing sits idle waiting on a sign-off.

  • We identify the reviewing jurisdiction — West Lake Hills, Rollingwood, Travis County or City of Austin — before design begins
  • Impervious cover, slope and tree protection reviewed early so the design does not get cut later
  • Watershed and water quality requirements addressed in the permit set
  • Septic and well coordination where applicable
  • All inspections scheduled and attended by our team

How Our Fixed-Price Design-Build Process Works

We design it, we permit it, and our own carpenters build it. One company, one contract, one point of contact.

Step one is an in-home walkthrough and a budget conversation, because there is no point designing a renovation you don't want to pay for. Step two is design: floor plans, elevations, selections for cabinetry, tile, counters, plumbing and lighting. Step three is the fixed price — a written number tied to a defined scope and a defined schedule. Step four is permitting. Step five is construction, on the calendar we already handed you.

Because selections are made during design, we are not stopping mid-build to wait on a tile decision or a cabinet reorder. That is the main reason our schedules hold and our prices don't move.

Everything we build carries a 5-year workmanship warranty.

Choosing a Contractor for a Westlake Renovation

A down-to-studs renovation is the largest construction project most homeowners will ever run. The contractor question that matters most is who is actually swinging the hammer. We keep carpenters on payroll rather than brokering the whole job to whoever is cheapest that month.

Ask any bidder these questions. If the answers are vague, the price will be too.

We also build kitchens, bathrooms, home additions, garage conversions and ADUs, and outdoor living spaces. On a whole-home project, all of it lands in one scope and one number.

  • Is this a fixed price or an estimate that can move? Ask for it in writing.
  • Who employs the framers and finish carpenters on my job?
  • Which jurisdiction permits my address, and who files it?
  • What is the construction schedule, and what happens if it slips?
  • What does the workmanship warranty cover and for how long?
  • Are selections locked before demolition, or decided as we go?
Planning a whole-home renovation project in Westlake? We'll put a fixed price on it — free.Get My Free Estimate Or read what a whole-home renovation in Austin involves

Westlake homeowners also ask

How much does a whole-home renovation cost in Westlake?

It depends on square footage and how much of the house comes apart. Use the kitchen as your anchor: most kitchens we build run $45,000 for a refresh with new counters, paint and fixtures up to $120,000 and above once walls move, plumbing relocates, and cabinetry is custom. Bathrooms, systems, windows and structural work stack on top. We scope your specific house and give you one fixed price in writing before any work starts.

Do I need a permit to renovate my house in West Lake Hills?

Yes. Structural changes, electrical, plumbing, mechanical work and most window and door openings all require permits. Your reviewing authority may be the City of West Lake Hills, Rollingwood, Travis County or the City of Austin depending on your exact parcel. Impervious cover, slope and tree protection rules apply on most Westlake lots. We confirm jurisdiction, prepare the drawings, file the applications and attend every inspection.

How long will my house be under construction?

Four to eight months of construction for a whole-home renovation. Design and permitting happen before that and before demolition, which is why the schedule holds once we start. For reference, a single bathroom is 3 to 5 weeks and a kitchen is 6 to 10 weeks — a whole house is those sequenced together with structural and systems work.

Can I stay in the house during the renovation?

On a down-to-studs project, usually not. Water, power and HVAC go offline in sections and the dust is everywhere. Most of our Westlake clients rent nearby for the duration. If staying is the only option, say so during design and we will phase the work into livable zones — it costs more and adds weeks, but it can be done.